Picture 1 of 1
Flood Resources Utilization in the Yangtze River Basin by Shouren Zheng (English
Condition:
3 available
Postage:
Located in: Fairfield, Ohio, United States
Delivery:
Estimated between Sat, 15 Jun and Thu, 27 Jun to 43230
Returns:
Coverage:
Read item description or contact seller for details. See all detailsSee all details on coverage
(Not eligible for eBay purchase protection programmes)
Shop with confidence
Seller information
- 98.3% positive feedback
Registered as a Business Seller
Seller assumes all responsibility for this listing.
eBay item number:386666257820
Item specifics
- Condition
- Brand New: A new, unread, unused book in perfect condition with no missing or damaged pages. See all condition definitionsopens in a new window or tab
- ISBN-13
- 9789811581106
- Type
- NA
- Publication Name
- NA
- ISBN
- 9789811581106
- Book Title
- Flood Resources Utilization in the Yangtze River Basin
- Item Length
- 9.3in
- Original Language
- Chinese
- Publisher
- Springer
- Publication Year
- 2021
- Format
- Trade Paperback
- Language
- English
- Genre
- Nature, Science
- Topic
- Environmental Science (See Also Chemistry / Environmental), Natural Disasters, Earth Sciences / General
- Item Width
- 6.1in
- Item Weight
- 20.1 Oz
- Number of Pages
- Xvi, 353 Pages
About this product
Product Information
Introduction.- Necessity of the research.- General situation of the Yangtze River Basin.- Characteristic and Variation Analysis of Water and Sediment in Yangtze River Basin.- Feasibility Study of Flood Resources Utilization in Yangtze River Basin.- Feasibility Study on Flood Resources Utilization of the Three Gorges Project.- Study on flood resources utilization and risk countermeasures in the Yangtze River Basin.- Study on the Floating of the Operating Water Level of the Three Gorges Project in Flood Season.- Study on Small Flood Dispatching Mode in the Three Gorges Project.- Study on early impoundment at the end of flood season for the Three Gorges Project.- Study on the Risk Measures of Flood Resources Utilization in the three Gorges Project.- Conclusions and Suggestions.
Product Identifiers
Publisher
Springer
ISBN-10
981158110x
ISBN-13
9789811581106
eBay Product ID (ePID)
21050431788
Product Key Features
Book Title
Flood Resources Utilization in the Yangtze River Basin
Original Language
Chinese
Format
Trade Paperback
Language
English
Topic
Environmental Science (See Also Chemistry / Environmental), Natural Disasters, Earth Sciences / General
Publication Year
2021
Genre
Nature, Science
Number of Pages
Xvi, 353 Pages
Dimensions
Item Length
9.3in
Item Width
6.1in
Item Weight
20.1 Oz
Additional Product Features
Number of Volumes
1 Vol.
Lc Classification Number
Gb5000-5030
Table of Content
Introduction.- Necessity of the research.- General situation of the Yangtze River Basin.- Characteristic and Variation Analysis of Water and Sediment in Yangtze River Basin.- Feasibility Study of Flood Resources Utilization in Yangtze River Basin.- Feasibility Study on Flood Resources Utilization of the Three Gorges Project.- Study on flood resources utilization and risk countermeasures in the Yangtze River Basin.- Study on the Floating of the Operating Water Level of the Three Gorges Project in Flood Season.- Study on Small Flood Dispatching Mode in the Three Gorges Project.- Study on early impoundment at the end of flood season for the Three Gorges Project.- Study on the Risk Measures of Flood Resources Utilization in the three Gorges Project.- Conclusions and Suggestions.
Copyright Date
2021
Illustrated
Yes
Item description from the seller
Seller assumes all responsibility for this listing.
eBay item number:386666257820
Postage and handling
Item location:
Fairfield, Ohio, United States
Post to:
Afghanistan, Albania, Algeria, Andorra, Angola, Anguilla, Antigua and Barbuda, Argentina, Armenia, Aruba, Australia, Austria, Azerbaijan Republic, Bahamas, Bahrain, Bangladesh, Belgium, Belize, Benin, Bermuda, Bhutan, Bolivia, Bosnia and Herzegovina, Botswana, Brazil, British Virgin Islands, Brunei Darussalam, Bulgaria, Burkina Faso, Burundi, Cambodia, Cameroon, Canada, Cape Verde Islands, Cayman Islands, Central African Republic, Chad, Chile, China, Colombia, Comoros, Cook Islands, Costa Rica, Cyprus, Czech Republic, Côte d'Ivoire (Ivory Coast), Democratic Republic of the Congo, Denmark, Djibouti, Dominica, Dominican Republic, Ecuador, Egypt, El Salvador, Equatorial Guinea, Eritrea, Estonia, Ethiopia, Falkland Islands (Islas Malvinas), Fiji, Finland, France, Gabon Republic, Gambia, Georgia, Germany, Ghana, Gibraltar, Greece, Greenland, Grenada, Guatemala, Guernsey, Guinea, Guinea-Bissau, Guyana, Haiti, Honduras, Hong Kong, Hungary, Iceland, India, Indonesia, Iraq, Ireland, Israel, Italy, Jamaica, Japan, Jersey, Jordan, Kazakhstan, Kenya, Kiribati, Kuwait, Kyrgyzstan, Laos, Latvia, Lebanon, Lesotho, Liberia, Liechtenstein, Lithuania, Luxembourg, Macau, Macedonia, Madagascar, Malawi, Malaysia, Maldives, Mali, Malta, Mauritania, Mauritius, Mayotte, Mexico, Moldova, Monaco, Mongolia, Montenegro, Montserrat, Morocco, Mozambique, Namibia, Nauru, Nepal, Netherlands, Netherlands Antilles, New Zealand, Nicaragua, Niger, Nigeria, Niue, Norway, Oman, Pakistan, Paraguay, Peru, Philippines, Poland, Portugal, Qatar, Republic of Croatia, Republic of the Congo, Romania, Rwanda, Saint Helena, Saint Kitts-Nevis, Saint Lucia, Saint Pierre and Miquelon, Saint Vincent and the Grenadines, San Marino, Saudi Arabia, Senegal, Serbia, Seychelles, Sierra Leone, Singapore, Slovakia, Slovenia, Solomon Islands, Somalia, South Africa, South Korea, Spain, Sri Lanka, Suriname, Svalbard and Jan Mayen, Swaziland, Sweden, Switzerland, Taiwan, Tajikistan, Tanzania, Thailand, Togo, Tonga, Trinidad and Tobago, Tunisia, Turkey, Turkmenistan, Turks and Caicos Islands, Tuvalu, Uganda, United Arab Emirates, United Kingdom, Uruguay, Uzbekistan, Vanuatu, Vatican City State, Vietnam, Wallis and Futuna, Western Sahara, Worldwide, Yemen, Zambia, Zimbabwe
Excludes:
APO/FPO, Alaska/Hawaii, Barbados, Belarus, French Guiana, French Polynesia, Guadeloupe, Libya, Martinique, New Caledonia, Panama, Papua New Guinea, Reunion, Russian Federation, US Protectorates, Ukraine, Venezuela, Western Samoa
Postage and handling | Each additional item | To | Service | Delivery*See Delivery notes |
---|---|---|---|---|
Free postage | Free | United States | Economy Shipping | Estimated between Sat, 15 Jun and Thu, 27 Jun to 43230 |
Handling time |
---|
Will usually post within 10 business days of receiving cleared payment. |
Taxes |
---|
Taxes may be applicable at checkout. Learn moreLearn more about paying tax on eBay purchases. |
Sales Tax for an item #386666257820
Sales Tax for an item #386666257820
Seller collects sales tax for items shipped to the following states:
State | Sales Tax Rate |
---|
Return policy
After receiving the item, contact seller within | Refund will be given as |
---|---|
30 days after the buyer receives it | Money Back |
The buyer is responsible for return postage costs.
Seller feedback (1,024,006)
a***s (180)- Feedback left by buyer.
Past month
Verified purchase
Smooth transaction and arrived sooner than expected. Thank you!
h***a (3224)- Feedback left by buyer.
Past month
Verified purchase
A+
1***o (2170)- Feedback left by buyer.
Past month
Verified purchase
Professional seller, perfect packaging, speedy service!!