1994 INDEPENDENCE SQUARE Rehabilitation Construction Project Plan Working Arch

US $35.99
ApproximatelyS$ 46.69
Was US $39.99 (10% off)What does this price mean?
Recent sales price provided by the seller
Condition:
Used
Clean with white paper. This set of project drawings looks to be unused and stored in original ... Read moreabout condition
Sale ends in: 10h 16m
Shipping:
US $20.00 (approx S$ 25.95) USPS Ground Advantage®.
Located in: Sun City, Arizona, United States
Delivery:
Estimated between Tue, 2 Dec and Mon, 8 Dec to 94104
Delivery time is estimated using our proprietary method which is based on the buyer's proximity to the item location, the shipping service selected, the seller's shipping history, and other factors. Delivery times may vary, especially during peak periods.
Returns:
No returns accepted.
Coverage:
Read item description or contact seller for details. See all detailsSee all details on coverage
(Not eligible for eBay purchase protection programmes)
Seller assumes all responsibility for this listing.
eBay item number:226067439152
Last updated on Nov 17, 2025 10:17:58 SGTView all revisionsView all revisions

Item specifics

Condition
Used
An item that has been used previously. See the seller's listing for full details and description of any imperfections. See all condition definitionsopens in a new window or tab
Seller Notes
“Clean with white paper. This set of project drawings looks to be unused and stored in original ...
Country of Origin
United States
Category

Item description from the seller

About this seller

Sue s Longaberger N More

100% positive feedback6.1K items sold

Joined Jan 1998
Usually responds within 24 hours
Thanks for shopping with me! Your item will ship quickly and be well packed.Sue

Detailed Seller Ratings

Average for the last 12 months
Accurate description
4.8
Reasonable shipping cost
4.7
Shipping speed
4.8
Communication
4.8

Seller feedback (3,379)

All ratingsselected
Positive
Neutral
Negative
  • 1***e (56)- Feedback left by buyer.
    Past 6 months
    Verified purchase
    Quality was great condition of the item was as posted in listing. Worth the value would recommend the seller. Quick and fast shipping
  • l***6 (1362)- Feedback left by buyer.
    Past 6 months
    Verified purchase
    Fast Shipping - Packaged Well - Nice Items - 5 Star Seller - Perfect Transaction - Thanks!!
  • a***a (230)- Feedback left by buyer.
    Past year
    Verified purchase
    I would give this seller a 10 star rating however, that is not an option. Exactly as described, priced appropriately, and packed safely. This seller answered my questions promptly and was accommodating to special requests. A big thank you!